HOW TO CALCULATE STEEL QUANTITY FOR SLAB?-REINFORCEMENT CALCULATION :TWO WAY SLAB

A Vision To Clear Solutions.


SLAB REINFORCEMENT CALCULATION

One way Slab Reinforcement DetailingThe Biggest misconception is considering beam outer to outer as slab span.Please refer the below diagram.


Let's take an example of the below one way slab diagram.




Given
  • Main Bars are 12mm in diameter @150mm centre to centre spacing
  • Distribution bars are 8mm in diameter @150mm centre to centre spacing.(Main Bar & Distribution bar difference)
  • Top & Bottom clear cover is 25mm
  • Consider Development length as 40d
  • Thickness of slab -150mm
One way slab Bar bending Schedule Calculation

Step-1

First ,find number of rods required for main reinforcement and distribution
Number of Bars Formula=(Length of slab/spacing)+1
Number of Main Bars=(Ly/spacing)+1=(5000/150)+1=34 nos
Number of Distribution Bars=(Lx/spacing)+1=(2000/150)+1=14 nos

Step 2
Find cutting length of main bars and distribution bars



Cutting Length of Main Bar,
= Clear Span of Slab (Lx) + (2 X Developement Length) +(1xInclined length) – (45°bend x 2)
Crank Length = 0.42 D, We have already discussed this on Cutting Length of Main Bar post
= 2000 + (2 x 40 x 12) + (1 x 0.42 x D) – (1d x 2)
= 2000 + 960 + 0.42D – (1x12x2) = 2960 +0.42D – 24

D = Slab thickness – 2 side clear cover – dia of bar = 150 – 50 -12 = 88 mm
Length of Main Bar = 2960+(0.42 x 88) – 24 = 2973 mm or 2.97 m

Step 3


Find length of distribution bar
= Clear Span (Ly) + (2 x Development Length (Ld))
= 5000 + (2 x 40 x 8) = 5640 mm or 5.64 m


Step 4


Find Top Bar (Extra) ; Top Bars are provided at the top of critical length (L/4) area,
Please refer the drawing section A-A
Number of top bars = (Lx/4) / spacing + 1 = (2000/4) / 150 +1 = 4 Nos x 2 sides = 8Nos
Length of Top Bar (L) = same as distribution bars = 5.64 m

Bar Bending Schedule for One Way Slab

S.no
Description
No.of Bars
Unit Qty
Total Qty
Diameter of Bar
Cutting Length
1
Main Bar
27
1
27
12
3.53m
2
Distribution Bar
21
1
21
8
4.34m
3
Top Bar (Ly)
5
1
5
8
4.96m
4
Top Bar (Lx)
6
1
6
8
3.96m

Two way slab Reinforcement Detailing


Now Calculate Bar Bending Schedule for Two Way Slab.

Let’s take an example the below two-way slab diagram




  • Main bars are 12 mm in diameter @ 150 mm centre to centre spacing
  • Distribution bars are 8 mm in diameter @ 150 mm centre to centre spacing.
  • Top and Bottom Clear Cover is 25 mm
  • Development length – 40 d
  • Thickness of Slab – 150 mm
One Way Slab Bar Bending Schedule Calculation


Step 1
  • First, find number of rods required for main reinforcement and distribution
  • Number of Required Bars Formula = (Length of slab / spacing) + 1
  • Number of Main Bars = Ly / spacing + 1 = (4000/150) + 1 = 27 nos
  • Number of Distribution Bars = Lx / spacing + 1 = 3000/150 + 1 = 21 nos
Step 2
Find cutting length of main bars and distribution bars


Cutting Length of Main Bar,
= Clear Span of Slab (Ly) + (1 X Developement Length) +(1 x inclined length) – (45°bend x 2)
Inclined Length = 0.42 D
= 3000 + (1 x 40 x 12) + (1 x 0.42 x D) – (1d x 2)
= 3000 + 480 + 0.42D – (1x12x2) = 3480 + 0.42 D -24
D = Slab thickness – 2 side clear cover – dia of bar = 150 – 50 -12 = 88 mm
Length of Main Bar = 3480+(0.42 x 88)-24 = 3492.9 mm or 3.49 m

Step 3


Find cutting length of distribution bar

= Clear Span of Slab (Ly) + (1 X Developement Length) +(1 x inclined length) – (45°bend x 2)

Inclined Length = 0.42 D
= 4000 + (1 x 40 x 8) + (1 x 0.42 x D) – (1d x 2)
= 4000 + 320 + (0.42×88) – (1x8x2) = 4340.96mm or 4.34 m


Step 4


Find Top Bar (Extra) ; Top Bars are provided at the top of critical length (L/4) area,
Please refer the drawing section A-A

Number of Top bars on Ly side = (Lx/5) / spacing + 1 = (3000/5) / 150 +1 = 5 Nos


Length of top bar on Ly side = Clear Span of Slab (Ly) + (2 X Development Length)


= 4000+(2*40*12) = 4000+960 = 4960 mm or 4.96 m


Number of Top bars on Lx side = (Ly/5) / spacing + 1 = (4000/5) / 150 + 1 = 6 Nos


Length of top bar on Ly side = Clear Span of Slab (Ly) + (2 X Development Length)


= 3000+(2*40*12) = 3000+960 = 3960 mm or 3.96 m


Bar Bending Schedule for Two Way Slab

S.no
Description
No.of Bars
Unit Qty
Total Qty
Diameter of Bar
Cutting Length
1
Main Bar
27
1
27
12
3.53m
2
Distribution Bar
21
1
21
8
4.34m
3
Top Bar (Ly)
5
1
5
8
4.96m
4
Top Bar (Lx)
6
1
6
8
3.96m

NOTE
  • Here we have taken development length as 40d. However, In practice, the structural drawing itself has this dimension or else you have to extend the rod up to the beam end minus clear cover.


Saturday, July 7, 2018

Why don’t we exclude steel volume in Concrete Calculation?

A Vision To Clear Solutions.


Whenever we calculate the concrete volume to cast structural members like a beam, footing or slab, we don’t actually exclude the steel reinforcement quantity.
Reason:
Steel quantity varies anywhere from 1% – 3% of the structural member’s volume which is comparatively low. So we will neglect that.
In simple,
Take the below example,
We will calculate the required concrete volume for the above beam as,
V = L x B x D = 3 x 0.2 x 0.5 = 0.3 m3
According to the thumb rule, the concrete wastage is 3%, the reinforcement for the above example may be 3% = 0.009 m
That steel reinforcement volume will be compromised with the wastage of concrete. So that we don’t actually exclude the steel reinforcement in concrete calculation
We hope you understand the concept.

Friday, July 6, 2018

CONSTRUCTION TOOLS NAMES WITH PICTURES AND USES


This post (building construction tools list) is written with the intention to make it as a go-to option for all of us.
Sometimes we know the tool but don’t know the name of them in English. We hope we all face this at least once in our life. The below list is a collective effort.
If you know some tools or have images that you think might be helpful for all of us, kindly let us know in the comment section. so we can add it here.
Let’s learn together (Don’t forget to share  )
Construction tools list with pictures
This list will be updated periodically (periodically)
Construction Tools List and their Uses
Search:
NAME
IMAGE
USES
Hoe
This tool is used to digging and to place concrete, cement mortar in head pan
Head Pan
This one is used to transport materials
Masonry trowel
This tool is used to place cement mortar
Measurement Tape

This is used to measure
Plumb Bob
This tool is used to check the vertical alignment of civil works
Wheel Barrow
This tool is used to transport cement mortar or any materials. Sometimes it also be used to measure the quantites of materials for site level concrete mixing
Concrete Mixer
This tool is used to thoroughly mix the concrete at site.
Vibrator

This tool is used to vibrate the concrete while pouring. For workability purpose, we all add water to concrete. To avoid that we are using vibrators. There are many types of vibrators
Rubber Boots
This one is used to prevent skin from chemical contact
Sand screening machine
This tool is used to sieve sand at site.
Gloves
This is used to avoid direct contact with dangerous tools, machines or to avoid any direct chemical material contact
Safety Glass
Used for safety purpose while drilling, hacking/roughening, grinding
Bump Cutter/Screed
This tool is used to level fresh concrete surface especially in slab concrete
Wooden Float/wooden rendering float
This tool is used to give a smooth finish to the plastered area
Chisel
This tool is used to remove excess or waste hard concrete
Crow Bar
This tool is used in fomwork to remove nails from boards
Framing Square
This tool is used in Brickwork, Plastering to check right angle
Framing Hammer
This tool is used to drive and remove nails
Line Level
This tool is used to check horizontal level in brickwork, plastering , flooring and tile works
Torpedo Level
Combination of line level and framing square
Cordless Drill
This tool is used to make pilot holes, replacing jumper (special type of drill should be used while drilling concrete)
Circular Saw
This tool is used to cut woods in shuttering
Hand Saw
This tool is used in wood works and shuttering
Block Plane / Jack Plane
This tool is used in Door and window wood works
Flat Pry Bar
This tool is used in shuttering sometimes used to adjust the column formwork to align
Earth Rammer
This tool is used to level the ground
Ladder
Digging bar
This tool is used to breakup and loosen the compacted / hard surface area
Polishers
This tool is used to smoothen the surface (wood or marble flooring)
Measuring Wheel
This tool is used to measure lengths. It varies by length
Measuring Box
This tool is used to measure the cement and sand while site mix
Tile Cutter
This tool is used to cut the tiles
Putty Knife
This tool is used in putty finishing to limit the thickness of the putty.
Vacuum Blower
This tools is used to clean the surface area from impurities (In flooring, Slab concrete etc.)
Do you find this helpful? Share it with your friends. 

Vastu Shastra For Building Construction – Beliefs, Benefits,Tips and Limitations

A Vision To Clear Solutions. Vastu Shastra is an ancient Indian science which capitalizes on the concept of prosperity. It links person...