A Vision To Clear Solutions.
APPROX MATERIAL NEEDED FOR 1CUM OF
SIZE STONE MASONRY WORK WITH DIFFERENT CEMENT MORTAR:
|
||||
Proportion
by
volume |
Grade
of
concrete |
Cement
in
cubic meter |
Sand
in cubic
meter |
Coarse
aggregate in cubic meter |
1:4:8
|
M
7.5
|
0.12
|
0.48
|
0.96
|
1:3:6
|
M10
|
0.15
|
0.45
|
0.90
|
1:2:4
|
M15
|
0.22
|
0.44
|
0.88
|
1:1.5:3
|
M20
|
0.28
|
0.42
|
0.84
|
1:1:2
|
M25
|
0.38
|
0.38
|
0.76
|
Note:The Volume of one cement bag is 0.0345 m3 or 1.25
cft
|
||||
APPROXIMATE MATERIALS REQUIRED FOR 1
CUM OF SIZE STONE MASONRY SIZE STONE MASONRY
|
||||
Cement
Mortar
|
Size
stone in cum
|
Cement
in cubic meter
|
Sand
in cubic
meter |
Boulders
in cubic meter
|
1:4
|
1.25
|
0.08
|
0.32
|
0.17
|
1:6
|
1.25
|
0.06
|
0.36
|
0.17
|
1:8
|
1.25
|
0.04
|
0.32
|
0.17
|
Note: 40% of dry mortar is used for size stone
masonry.
|
||||
APPROXIMATE MATERIALS REQUIRED FOR
1CUM OF 8” SOLID WALL BLOCK WORK
|
||||
Cement
Mortar
|
Cement
in cft
|
Sand
in cft
|
||
1:6
|
0.25
|
1.50
|
||
1:5
|
0.29
|
1.45
|
||
1:4
|
0.35
|
1.40
|
||
1:3
|
0.40
|
1.20
|
||
1:2
|
0.55
|
1.10
|
||
APPROXIMATE MATERIALS REQUIRED FOR 1
CUM OF 4”
SOLID WALL BLOCKWORK |
||||
Cement
Mortar
|
Cement
in cft
|
Sand
in cft
|
||
1:6
|
0.33
|
2.00
|
||
1:5
|
0.36
|
1.80
|
||
1:4
|
0.45
|
1.8
|
||
1:3
|
0.55
|
1.65
|
||
1:2
|
0.75
|
1.50
|
||
APPROXIMATE MATERIAL REQUIRED FOR
1CUM OF BRICKWORK WITH CEMENT MORTAR OF DIFFERENT PROPORTIONS:
|
||||
Cement
Mortar
|
Bricks
|
Cement
in cubic meter
|
Sand
in cubic
meter |
|
1:2
|
500
|
0.1
|
0.2
|
|
1:3
|
500
|
0.08
|
0.24
|
|
1:4
|
500
|
0.06
|
0.24
|
|
1:6
|
500
|
0.04
|
0.24
|
|
Size of standard brick is taken as
200mm*100mm*100mm with mortar joint less than 10mm thick and dry mortar is
used.
|
||||
APPROXIMATE MATERIAL NEEDE FOR
PLASTERING OF 100 SQUARE METRE AREA USING DIFFERENT PROPORTION OF CEMENT
MORTAR:
|
||||
Cement
Mortar
|
Cement
in Cum
|
Sand
in Cum
|
||
1:2
|
0.6
|
1.2
|
||
1:3
|
0.45
|
1.135
|
||
1:4
|
0.4
|
1.6
|
||
1:5
|
0.35
|
1.75
|
||
1:6
|
0.3
|
1.8
|
||
Thickness of plastering is taken as
12mm.
|
||||
APPROXIMATE MATERIAL NEEDED FOR
PLASTERING OF 100SQM AREA USING DIFFERENT PROPORTION OF CEMENT MORTAR
THICKNESS OF PLASTERING IS 20MM:
|
||||
Cement
Mortar
|
Cement
in Cum
|
Sand
in Cum
|
||
1:2
|
1
|
2
|
||
1:3
|
0.78
|
2.34
|
||
1:4
|
0.65
|
2.6
|
||
1:5
|
0.54
|
2.7
|
||
1:6
|
0.46
|
2.76
|
||
xWEIGHT OF STEEL RODS:
|
||||
Diameter
of rod
|
Weight
in kg/m
|
Lap length in mm
|
||
6mm
|
0.2218
|
300
|
||
8mm
|
0.3943
|
400
|
||
10mm
|
0.6162
|
500
|
||
12mm
|
0.8874
|
600
|
||
16mm
|
1.5771
|
800
|
||
20mm
|
2.4649
|
1000
|
||
25mm
|
3.8514
|
1250
|
||
32mm
|
6.3101
|
1800
|
||
The length of one rod which is
available is site is 40 feet or 12 meter.
|
||||
CONVERSIONS:
|
||||
1cent=435.6 square feet
|
||||
1acre=100 cent
|
||||
1meter=3.281 feet
|
||||
1square meter= 10.76 square feet.
|
||||
1cubic meter= 35.31 cubic feet
|
||||
1kg=9.81N
|
||||
1kg/cm²=1Nmm²
|
||||
1kg=1litre
|
||||
1cubic meter=1000 litres
|
||||
1cubic feet=28.3 litres.
|
||||
1acre=43560 square feet
|
||||
1inch=2.54 cm
|
||||
12 inch= 1feet
|
||||
1feet= 30 cm.
|
||||
1 gunter chain=66 feet.
|
||||
1 gunta=1089 square feet.
|
||||
APPROXIMATE MATERIAL REQUIRED FOR
WHITE WASHING, DISTEMPERING, AND PAINTING OF 100 SQUARE METER AREA:
|
||||
S.no
|
Description
of Work
|
Quantity
|
||
1
|
Lime for white washing ( 1 coat)
|
10
kgs
|
||
2
|
Dry
distemper 1st coat
|
6.5
kgs
|
||
3
|
Dry
distemper 2nd coat
|
5.0
kgs
|
||
4
|
Snow
cem for 1st coat
|
30.0
kgs
|
||
5
|
Snow
cem for 2nd coat
|
20.0
kgs
|
||
6
|
Paint ready mixed for one coat
|
10
litres
|
||
7
|
Paint
stiff for one coat
|
10
kgs
|
No comments: