SLAB REINFORCEMENT CALCULATION

One way Slab Reinforcement DetailingThe Biggest misconception is considering beam outer to outer as slab span.Please refer the below diagram.


Let's take an example of the below one way slab diagram.




Given
  • Main Bars are 12mm in diameter @150mm centre to centre spacing
  • Distribution bars are 8mm in diameter @150mm centre to centre spacing.(Main Bar & Distribution bar difference)
  • Top & Bottom clear cover is 25mm
  • Consider Development length as 40d
  • Thickness of slab -150mm
One way slab Bar bending Schedule Calculation

Step-1

First ,find number of rods required for main reinforcement and distribution
Number of Bars Formula=(Length of slab/spacing)+1
Number of Main Bars=(Ly/spacing)+1=(5000/150)+1=34 nos
Number of Distribution Bars=(Lx/spacing)+1=(2000/150)+1=14 nos

Step 2
Find cutting length of main bars and distribution bars



Cutting Length of Main Bar,
= Clear Span of Slab (Lx) + (2 X Developement Length) +(1xInclined length) – (45°bend x 2)
Crank Length = 0.42 D, We have already discussed this on Cutting Length of Main Bar post
= 2000 + (2 x 40 x 12) + (1 x 0.42 x D) – (1d x 2)
= 2000 + 960 + 0.42D – (1x12x2) = 2960 +0.42D – 24

D = Slab thickness – 2 side clear cover – dia of bar = 150 – 50 -12 = 88 mm
Length of Main Bar = 2960+(0.42 x 88) – 24 = 2973 mm or 2.97 m

Step 3


Find length of distribution bar
= Clear Span (Ly) + (2 x Development Length (Ld))
= 5000 + (2 x 40 x 8) = 5640 mm or 5.64 m


Step 4


Find Top Bar (Extra) ; Top Bars are provided at the top of critical length (L/4) area,
Please refer the drawing section A-A
Number of top bars = (Lx/4) / spacing + 1 = (2000/4) / 150 +1 = 4 Nos x 2 sides = 8Nos
Length of Top Bar (L) = same as distribution bars = 5.64 m

Bar Bending Schedule for One Way Slab

S.no
Description
No.of Bars
Unit Qty
Total Qty
Diameter of Bar
Cutting Length
1
Main Bar
27
1
27
12
3.53m
2
Distribution Bar
21
1
21
8
4.34m
3
Top Bar (Ly)
5
1
5
8
4.96m
4
Top Bar (Lx)
6
1
6
8
3.96m

Two way slab Reinforcement Detailing


Now Calculate Bar Bending Schedule for Two Way Slab.

Let’s take an example the below two-way slab diagram




  • Main bars are 12 mm in diameter @ 150 mm centre to centre spacing
  • Distribution bars are 8 mm in diameter @ 150 mm centre to centre spacing.
  • Top and Bottom Clear Cover is 25 mm
  • Development length – 40 d
  • Thickness of Slab – 150 mm
One Way Slab Bar Bending Schedule Calculation


Step 1
  • First, find number of rods required for main reinforcement and distribution
  • Number of Required Bars Formula = (Length of slab / spacing) + 1
  • Number of Main Bars = Ly / spacing + 1 = (4000/150) + 1 = 27 nos
  • Number of Distribution Bars = Lx / spacing + 1 = 3000/150 + 1 = 21 nos
Step 2
Find cutting length of main bars and distribution bars


Cutting Length of Main Bar,
= Clear Span of Slab (Ly) + (1 X Developement Length) +(1 x inclined length) – (45°bend x 2)
Inclined Length = 0.42 D
= 3000 + (1 x 40 x 12) + (1 x 0.42 x D) – (1d x 2)
= 3000 + 480 + 0.42D – (1x12x2) = 3480 + 0.42 D -24
D = Slab thickness – 2 side clear cover – dia of bar = 150 – 50 -12 = 88 mm
Length of Main Bar = 3480+(0.42 x 88)-24 = 3492.9 mm or 3.49 m

Step 3


Find cutting length of distribution bar

= Clear Span of Slab (Ly) + (1 X Developement Length) +(1 x inclined length) – (45°bend x 2)

Inclined Length = 0.42 D
= 4000 + (1 x 40 x 8) + (1 x 0.42 x D) – (1d x 2)
= 4000 + 320 + (0.42×88) – (1x8x2) = 4340.96mm or 4.34 m


Step 4


Find Top Bar (Extra) ; Top Bars are provided at the top of critical length (L/4) area,
Please refer the drawing section A-A

Number of Top bars on Ly side = (Lx/5) / spacing + 1 = (3000/5) / 150 +1 = 5 Nos


Length of top bar on Ly side = Clear Span of Slab (Ly) + (2 X Development Length)


= 4000+(2*40*12) = 4000+960 = 4960 mm or 4.96 m


Number of Top bars on Lx side = (Ly/5) / spacing + 1 = (4000/5) / 150 + 1 = 6 Nos


Length of top bar on Ly side = Clear Span of Slab (Ly) + (2 X Development Length)


= 3000+(2*40*12) = 3000+960 = 3960 mm or 3.96 m


Bar Bending Schedule for Two Way Slab

S.no
Description
No.of Bars
Unit Qty
Total Qty
Diameter of Bar
Cutting Length
1
Main Bar
27
1
27
12
3.53m
2
Distribution Bar
21
1
21
8
4.34m
3
Top Bar (Ly)
5
1
5
8
4.96m
4
Top Bar (Lx)
6
1
6
8
3.96m

NOTE
  • Here we have taken development length as 40d. However, In practice, the structural drawing itself has this dimension or else you have to extend the rod up to the beam end minus clear cover.