Following are few general points to remember for civil site
engineers to make the construction work easier while maintaining quality of construction.· Lapping is not allowed for
the bars having diameters more than 36 mm. · Chair spacing maximum
spacing is 1.00 m (or) 1 No per 1m2. · For dowels rod minimum of 12
mm diameter should be used. · Chairs minimum of 12 mm
diameter bars to be used. · Longitudinal reinforcement
not less than 0.8% and more than 6% of gross C/S. · Minimum bars for square
column is 4 No’s and 6 No’s for circular column. · Main bars in the slabs shall
not be less than 8 mm (HYSD) or 10 mm (Plain bars) and the
distributors not less than 8 mm and not more than 1/8 of slab thickness.· Minimum thickness of slab is
125 mm. · Dimension tolerance for
cubes + 2 mm. · Free fall of concrete is
allowed maximum to 1.50m. · Lap slices not be used for
bar larger than 36 mm. · Water absorption of bricks
should not be more than 15 %. · PH value of the water should
not be less than 6. · Compressive strength of
Bricks is 3.5 N / mm2. · In steel reinforcement
binding wire required is 8 kg per MT. · In soil filling as per IS
code, 3 samples should be taken for core cutting test for every 100m2. Density of Materials:
Material
Density
Bricks
1600 – 1920 kg/m3
Concrete
block 1920 kg/ m3
Reinforced
concrete 2310 – 2700 kg/ m3
Curing
time of RCC Members for different types of cement:
Super
Sulphate cement: 7 days
Ordinary
Portland cement OPC: 10 days
Minerals
& Admixture added cement: 14 days
De-Shuttering
time of different RCC Members
RCC
Member De-shuttering time
For
columns, walls, vertical form works 16-24 hrs.
Soffit
formwork to slab 3 days (props to be refixed after removal)
Soffit
to beams props 7 days (props to refixed after removal)
Beams
spanning upto 4.5m 7 days
Beams
spanning over 4.5m 14 days
Arches
spanning up to 6m 14 days
Arches
spanning over 6m 21 days
Cube
samples required for different quantity of concrete (As
per IS 456-2000)Quantity
of Concrete No. of cubes required